Man Camp Workforce Housing for Construction Site in Zhengzhou
- 时间:
- 浏览:0
- 来源:新墅板
Man Camp Workforce Housing for Construction Site in Zhengzhou
Product: Container Camp ConstructionManufactured by: K-home
Purpose of Use: Man camp
Quantity: 80 Units
Time: 2019
Location: Zhengzhou
Photo Gallary
-
Glass Wall
-
Glass Window
-
Right View
-
Corrider
-
Office
-
Office
-
Meeting Room
-
Glass Wall
-
Stair
-
Corrider
-
Column Connection
-
Light
-
Window and Door
-
Cubical Room
-
Cubical Room
Challenges
- 30 days total from production to ready to use.
- Basic furniture are also need including in.
- This is a turn-key project.
- Foundation also needs to solve by us.
- They need different function rooms, including management office, staff office, management dormitory, staff dormitory, and worker dormitories, toilet rooms, shower rooms, laundry rooms, small shops, storage room, etc.
Man Camp Workforce Housing Solutions
- To solve the very tighten production and assemble period, all items choose modular size and standard configuration could meet this strict requirement.
- The foundation need long time to make the ground in leveled, so when we make production send a team to their site starts working for the foundation of the Temporary Workforce Housing.
- Firstly confirm with them about the land size, then we know how many units container house need total, then based on their daily working schedule, and there prefer, we make a detail internal layout.
- Due to all the items of the Remote Workforce Housing is the same, so we could confirm with them the detail internal layout when we assemble the whole structure.
- We have long-term cooperation clients who can provide furniture to us, so once we confirm the design, choose the suitable size furniture then send to our clients for choose. All the production could starts at the same time.
Outcome
They were surprised that we were able to complete the construction of this Mobile Workforce Housing in such a short period of time. The workers could put in the work on the new site in time, and the room was bright and comfortable, with good heat insulation, sound insulation, and fire prevention effects, and the quality was good. They refreshed their understanding of temporary buildings and will continue to cooperate if necessary in the future.Projects Show
Modern Steel Frame House for Office Project
Modular Container Homes Project in Puerto Rico
Portable Container living Quarters in Malaysia
Temporary Modular Student Housing In Guyana
Site Office Container For Car Service Shop
Construction Site Accommodation for Staff in the Philippines
Temporary Site Accommodation Project in Construction
Mass Housing Project Successfully Completed
Temporary Workforce Housing Project in Nigeria
Remote Camp/Housing Solutions
Prefabricated Labour Hutment for Road Construction Workers
Ethiopia Poultry Farm Shed for Laying Hens is Successfully completed
3-Storey Container House Project Temporary Housing Camp During Construction
Prefab Warehouse Buildings Project in Belize
Oil Field Housing Project in South Sudan
Mine Site Accommodation Man Camps in GCC
Portable Man Camps for Foreign Worker Housing Philippines
Construction Site Camp for Military In Mali
Portable Living Quarters For Work Facility In Zhengzhou
SEND A MESSAGE
猜你喜欢